The Construction Source Australia

| March 2021 ACHIEVING RESULTS PROUD TO BE ASSOCIATEDWITH JOHN HOLLAND INSTALLING Sanitary xtures and tap ware Sewer wastes and vents Potable water Non – potable water Water treatment-RO systems Gas services Fire services Hot water systems with solar and gas boosters and pumps Supply and install sectional water tanks Leisk Hydraulics 421 Karnup Road HopelandWA 6125 P:9525 2945 F:9525 2146 E: admin@leiskhydraulics.com.au TO THE ICU CSSD Public Wards Kitchen St Johns Ambulance Centre Child Care Centre Theatres “Our role was to ensure the design met the project budget and could be delivered within the project timeline,” Jay says. “This required our team to meet regularly with the design team to achieve a balance between design features,budget, and constructability. The client’s project manager was supportive of this process and valued our input.” Additionally, John Holland developed strong affiliations with the subcontractors on the project, many of whom they had al- ready worked with on previous projects. By holding interviews, they were able to ensure that everyone on site was prepared to adapt to the JohnHolland way of building – which meant following their safety procedures, and being willing and flexible enough to over- come technical challenges. In addition to the evolving scope of work, some of the main challenges that faced the Joondalup Health Campus Redevelopmen- ton the project were logistical. The company was working in a brown-field site, with many existing live services. One of their main ob- Ph: (08) 9240 1992 Fax: (08) 9240 1525 7 Macadam Place, Balcatta WA 6021 www.centigrade.com.au Proud to be Associated with John Holland for the Construction of JOONDALUP HEALTH CAMPUS REDEVELOPMENT Mechanical Services Airconditioning Ventilation Industrial/Medical Gases Commissioning Maintenance Contractors and Project Managers

RkJQdWJsaXNoZXIy OTYzNTg=