The Construction Source Australia

JULY 2022 it cantilevers off the base of the pool. There’s so much that went into it.” The pool in question took approximately two years to complete – partially because it was built around an existing house that was undergoing renovations, and partially because of the amount of detail. For example, it was fully tiled both inside and outside, and the tiles transitioned from one size to another to create different effects within the water. “That pool was really designed to be a show-stopper,” Danica explains. “It’s the focal point of the property. It’s truly one-of-akind.” The inspiration for the design came from a pool the clients experienced at a resort in Bali. Their goal with this project was to create the same sort of feeling they had there within their own. Danica believes they successfully achieved that goal. “They just love it,” she says of the finished product. “They spend all their afternoons in it. It’s a great way to cool off.” And the pool is never too far from the clients’ mind, she adds, because of how integrated it is with the home. “You can see it from everywhere in the house. It’s just a step away from the entertaining area. It’s integrated with the deck. And with the lighting, it’s always a feature of the property.”

RkJQdWJsaXNoZXIy OTYzNTg=