The Construction Source Australia

Moving forward, James and Rachel are focused not only on growing JMB, but also on helping shape the broader framework for volumetric modular construction in Australia. James believes the current regulatory system does not always fully recognise the differences between conventional site-based construction and advanced offsite manufacturing. “Volumetric modular construction still needs to comply with the same fundamental building standards, but the way those buildings are designed, manufactured, inspected and delivered is very different,” James says. “The opportunity is to develop a framework that recognises that difference without compromising safety, quality or accountability.” For JMB, one of the key opportunities is greater recognition of Pushing for change THE CONSTRUCTION SOURCE AUSTRALIA

RkJQdWJsaXNoZXIy OTYzNTg=